Description of work
The planned construction along the Elora Cataract Trail will occur between Trafalgar Road and Main Street / Wellington Road 124, connecting the future Hillsburgh and Erin Village wastewater collection systems via gravity sewer. A new watermain connecting Hillsburgh to the water distribution system in Erin Village will also be installed.
Trees will be removed along the trail to allow for the installation of the linear infrastructure. Following construction of the gravity sewer and watermain, new trees will be planted and the trail pathway will be restored to its original or better condition.
Town Of Erin Team:
WSP Team:
Construction Team (Nabolsy Contracting Inc.):
Town Of Erin Team:
- Project Manager – Khalid Rahman, P.Eng.
WSP Team:
- Project Manager – Claudio Micelli, P.Eng., PMP
- Director, Linear Infrastructure – Chris Ewen, P.Eng., PMP
- Project Sponsor – Michelle Albert, P.Eng., PMP
- Lead Designer – Nima Aghinaey, Ph.D., P.Eng.
- Director, Construction – Vijay Sole, P.Eng.
- Contract Administrator – Qamar Janjua, C.E.T., RCCA
- Construction Inspector – Thomas Jayachandramoulie
Construction Team (Nabolsy Contracting Inc.):
- Director / Project Manager – Saleh Elnabolsy
- Site Supervisor – Husam Al-Taie